Project Profile: Large Virginia Manufacturer

Greg Ramsey
Greg Ramsey

a bright, well-lit assembly line in a manufacturing plant with automated yellow tracks and an orange hand railing.

Here at SW Funk Industrial Contractors, we take the privacy of our clients seriously. In this case study, we refer to our client as “large Virginia manufacturer,” or “the client” for short.

With a partnership dating back to the late 1980s, our team at SW Funk Industrial Contractors and this large Virginia manufacturer have worked on countless projects together, establishing a long-standing history of success. 

This specific project was divided into two phases: the concrete work phase (Phase 1) and the steel maintenance phase (Phase 2). SW Funk Industrial Contractors was awarded the concrete work — we removed an old inadequate concrete slab and replaced it with a new, thicker concrete slab to support the new equipment intended to go in that area. Our team successfully completed this phase to meet the client's project schedule, allowing Phase 2 to quickly commence. 

The new steel maintenance project had an estimated budget of around $1,000,000. The project involved removing undersized beams from the ceiling and replacing them with new ones to support an additional floor. The extra floor was for production purposes, requiring a walkable ceiling. 

They initially hired a local competitor, a regular contractor at the facility, who successfully outbid us on the project by offering a quicker timeline — a common and understandable business decision. The original contractor promised a shorter turnaround, but when it came to execution, this timeline proved to be overambitious.

The initial contractor quickly fell behind the planned schedule, delaying other trades that were set to follow the steelwork and causing a ripple effect across the project. Along with the delays, five safety incidents were reported, further impacting the plant’s operations and jeopardizing critical upcoming milestones.

To address these issues, the client decided to bring in Greg Ramsey, SW Funk Industrial Contractors' Key Account Manager, to finish the job as they remembered our timeline reliability and commitment to safety from our previous concrete work. 

We immediately started on the submittal and approval processes after being awarded the project, allowing for the quickest start time possible. Then, within just a week’s time, we staffed an entire team to ensure we had the manpower and resources needed to complete the project in a timely manner.

Safety Over Everything

With an original target of six weeks, the project was completed in seven weeks despite the complexities of the steel installation, additional design requests made from the client and the previous contractor’s delays caused by safety incidents. 

Due to the original safety incidents , we hired an established third-party safety team composed of retired and active firefighters specializing in fall protection and site safety. They remained on-site at all times to ensure a protected working environment, which was especially essential because construction teams were working five 12-hour days to ensure timelines were met. 

Because of the tight turnaround, 40 to 50 workers were on-site at one time plus all of the equipment, creating a congested work environment that could cause potential safety concerns if not properly managed.

However, with John McCreary as the project manager on this job, and our team’s professionalism on the project, no more safety incidents were reported. At SW Funk Industrial Contractors, safety permeates every project. We aspire to a zero-incident safety record by prioritizing prevention, and we guarantee every employee meets MSHA, OSHA or any other certification the job site requires. 

Our safety management system allows us to assess the risk profile for every project and provide a training matrix for each team member. This system includes a daily job safety analysis and a comprehensive project hazard study, starting at the project kick-off with routine reviewing. 

We create a culture of safety through weekly group safety meetings, safety audits and safety programs. For this specific project, two safety talks per day were conducted by foremen or superintendents for enhanced protection. Our operations and safety personnel work together as one team to find practical, cost-effective solutions to a project’s safety concerns. 

While a third-party safety team wasn’t required, we took this extra step to prevent additional incidents and costly delays, demonstrating our commitment to safety on every project.   

A Process Overhaul

Because the project was a takeover from another contractor, the process differed from our standard projects. 

It required much more pre-planning, inventory management and a constant assurance that all materials were accounted for from start to finish. We had to go back, repeat the steps the previous contractor took and ensure they met our standards. 

The client had a third-party inspector that inspected and approved SW Funk's welds throughout the project.

With the help of the owner’s project management team, the inspection and engineering process was seamless. Their involvement in the project was crucial to our success.

With this process overhaul of improved safety standards and prequalifications, we helped avoid any further delays, unnecessary costs and safety incidents. By prioritizing both safety and scheduling, we delivered a successful project with minimal impact on the client’s schedule and operations. 

Prioritize Your Facility Maintenance With SW Funk Industrial Contractors 

There is a stigma around getting work done on facilities. Facility maintenance is a vital part of keeping a property in good condition. It improves workplace quality and employee productivity — and, above all, it keeps the property safe. 

The client deserves all the fanfare for being proactive and prioritizing their facility construction and maintenance and calling an audible when safety standards weren’t met. Our experts at SW Funk Industrial Contractors are grateful we could step in when they needed a partner who prioritized safety and timeline compliance. 

Ready to upgrade or repair your facility? SW Funk Industrial Contractors provides a wide spectrum of general construction services, including site work, underground utilities, interior finishes and more. We are steel fabrication and erection experts for industrial facilities, specializing in platforms, catwalks, steel structures and buildings of all sizes and complexity.

From large foundations to complex anchor bolt layouts, we are also masters at placing precision concrete. With specialization in complex concrete installations, we can complete installations and repairs without disrupting existing operations. 

Contact us today to see how our professionals at SW Funk Industrial Contractors can assist you on your next project.