B52 Copolymer Project

,

SW Funk Industrial was chosen to fabricate and erect a multi-level structure for a manufacturing process for a polymer production facility. Total tonnage is approximately 60T, and the work was located in an existing and operating area of the facility with limited space where special precautions were needed to be taken due to the proximity of existing pipe bridges and power lines.

  • Honeywell Chesterfield
  • Chesterfield, VA
  • Completed: 2015
  • Industry: Manufacturing
  • Scope: Steel Erection, Steel Fabrication, Concrete